> ## Content Index
> Fetch the complete content index at: https://www.trxl.co/llms.txt
> Use this file to discover other available public pages before exploring further.

# ✱ Construction Update - Poly High School
- URL: https://www.trxl.co/2012-10-16-construction-update-poly-high-school/
- Published: 2012-10-17T00:05:13.000Z
- Updated: 2023-07-25T00:26:05.000Z
- Author: Evan Troxel
- Tags: Architecture, Photography, design, design process, #sqs, #Import-blog1, #evantroxel-me-com

Here is a construction photo I made today and the comparative rendering of a similar view of the entry to a new aquatic complex at Riverside Polytechnic High School in southern California.

You can see how far along the project is so far. It's turning out beautifully.The cantilevered roof covers a ticket and concession room (which isn't built yet), locker rooms (on the right side), and the pool pump equipment is housed in the left-hand building.

I didn't tweak the image at all, and was stretched up over a construction fence to get the shot, so I'm happy with how close they came out.

![© 2012 Evan Troxel](https://storage.ghost.io/c/93/80/9380fef7-629b-48bf-9c81-27fe48a999cc/content/images/content/v1/4fb6ec4fe4b093525981eab3/1350432387504-3EH2EHR5LN53SSOG56DR/poly-hs-aquatics1.jpg)

© 2012 Evan Troxel

![© 2011 HMC Architects](https://storage.ghost.io/c/93/80/9380fef7-629b-48bf-9c81-27fe48a999cc/content/images/content/v1/4fb6ec4fe4b093525981eab3/1350432639075-KH8GVNFZ536W0K1U72JG/polyhs_aquatics_3.jpg)

© 2011 HMC Architects